Cut Edge Corrosion Treatment Surrey
- Save a fortune versus re-cladding your building
- Halt corrosion before it becomes structural
- Push your re-cladding decision years into the future
- Remove rust streaks and refresh your building





GET A CALLBACK FROM OUR DORSET TEAM


- 20+ YEARS OF INDUSTRY EXPERIENCE
- 25+ YEAR OF WARRANTY
- NATIONWIDE SERVICE ACROSS THE UK
- HIGH ADHESION COATING AND FAST CURING
- HARD WEARING COATINGS
WHAT IS CUT EDGE CORROSION TREATMENT?
Cut edge corrosion is one of the most common causes of cladding failure on Surrey industrial and commercial buildings. It occurs where the protective plastisol coating breaks down at the cut edges of steel sheets, exposing bare metal that rusts and lifts the surrounding coating. What begins as a brown streak soon spreads, weakening the sheet and threatening the integrity of the whole building envelope.
Our Surrey cut edge corrosion treatment arrests the rust, stabilises the steel and re-seals every edge using Tor Elastaseal Fibretex and Delcote Seamsil systems over a rust-inhibiting primer. Topcoats are colour-matched to your existing cladding for a seamless finish, and the work is backed by an Insurance Backed Guarantee of up to 15 years.

WHY CUT EDGE CORROSION TREATMENT IS ESSENTIAL
Protects Surfaces from Corrosion & Wear
The danger with cut edge corrosion in Surrey is how fast it spreads. Our treatment halts the chemical process at source, treats the exposed metal and seals the edge so the damage stops where it is.
Improves Safety & Compliance
A degraded building envelope in Surrey is both a safety and an insurance concern. Treating cut edge corrosion promptly restores the integrity of the cladding and roof and protects everyone around the building.
Extends Asset Lifespan
Every year you add to your cladding is money saved. Cut edge corrosion treatment in Surrey extends the life of the sheeting by up to 15 years, backed by an Insurance Backed Guarantee.
Enhances Professional Appearance
Nothing dates a Surrey building faster than rust-streaked cladding. Our treatment removes the streaks, re-establishes a sharp colour line and lifts the appearance of the whole property.
Cost-Effective Refurbishment
Replacing plastisol cladding is hugely expensive and disruptive. A specialist cut edge corrosion treatment in Surrey typically costs a small fraction of replacement, removes the need for scaffolded sheet replacement, and allows the building to remain fully operational.
REQUEST A CALLBACK
Lorem ipsum dolor sit amet, consectetur adipiscing elit ed rutrum pharetra risus.

Roof Spraying

Cut-Edge Corrosion Treatment

Cladding Spraying

Window & Curtain Wall Spraying

Industrial uPVC Spray Painting

OUR CUT EDGE CORROSION TREATMENT PROCESS
Step 1: Initial Consultation & Site Survey
Step one is a free, detailed inspection of your Surrey cladding. We measure the affected edges, assess the substrate and produce a clear written specification and quotation.
Step 2: Surface Preparation
We rake back loose plastisol, mechanically remove rust to a sound substrate, feather the edge to a clean line and apply a rust-inhibiting bare-metal primer across all exposed steel in Surrey.
Step 3: Cut Edge Corrosion Treatment Application
Our Surrey team applies the chosen Tor Elastaseal Fibretex or Delcote Seamsil system over the prepared edge, encapsulating the corrosion and sealing every lap and cut edge.
Step 4: Quality Checks & Final Handover
Final handover on your Surrey site includes colour-matched topcoats, a full inspection against specification and your Insurance Backed Guarantee paperwork.
Our projects

Sky London Campus
Sky – Sky 2 / Sky 4
Colorkote has successfully completed a number of large scale spraying and painting projects for Sky within their London Campus. Due to the construction of the new Flagship Sky Central office complex including studios, a number of existing buildings were looking tired and due to the high profile visitors that Sky attracts they wanted these buildings re-coated and brought up to date.

London
Residential Blocks
This group of 10 blocks of flats are undergoing full window replacement. The surrounding wooden fascia, soffits and shiplap boarding required full decoration to match the new wooden windows. All the 105 flats are occupied, meaning all works had to be carefully programmed to cause minimal disruption to the residents. All works were completed using fixed scaffolding supplied by the main contractor.

London
Waste Recycling Plant
The site was a blight on the landscape being a very large building of bright colour. The client wished to tone down the building to blend in with the local landscape. A 10 yr warranty was requested on the completed work, and the building required very specialist high-level access, especially for the chimneys. Additionally the site needed to remain fully operational with hundreds of lorry deliveries daily.

FAQS
OUR COVERAGE AREA
From the heart of Surrey to the edges of the county, Colorkote provides specialist cut edge corrosion treatment to every type of industrial and commercial building. Our Surrey team is regularly on site at industrial estates, business parks, warehouses, distribution centres and retail parks, with crews routinely mobilising to neighbouring towns and districts. We can scale a job from a single building to a multi-site programme, and our nationwide capability means we can extend the same standards UK-wide. To get started, call 01202798993.
WHAT OUR CUSTOMERS SAY
Exactly the right solution
Neil R., Asset Manager
Genuine specialists
Lisa P., Asset Manager
Brilliant project management
Chris N., Operations Manager
A smart alternative to re-cladding
Mike T., Facilities Lead
Excellent contractor to work with
Daniel F., Estates Lead
