Cut Edge Corrosion Treatment Cambridgeshire
- A fraction of the cost of new cladding
- Stop creeping rust before it causes real damage
- Push your re-cladding decision years into the future
- Improve how your building looks, fast





GET A CALLBACK FROM OUR DORSET TEAM


- 20+ YEARS OF INDUSTRY EXPERIENCE
- 25+ YEAR OF WARRANTY
- NATIONWIDE SERVICE ACROSS THE UK
- HIGH ADHESION COATING AND FAST CURING
- HARD WEARING COATINGS
WHAT IS CUT EDGE CORROSION TREATMENT?
Cut edge corrosion is one of the most common causes of cladding failure on Cambridgeshire industrial and commercial buildings. It occurs where the protective plastisol coating breaks down at the cut edges of steel sheets, exposing bare metal that rusts and lifts the surrounding coating. What begins as a brown streak soon spreads, weakening the sheet and threatening the integrity of the whole building envelope.
Our Cambridgeshire cut edge corrosion treatment arrests the rust, stabilises the steel and re-seals every edge using Tor Elastaseal Fibretex and Delcote Seamsil systems over a rust-inhibiting primer. Topcoats are colour-matched to your existing cladding for a seamless finish, and the work is backed by an Insurance Backed Guarantee of up to 15 years.

WHY CUT EDGE CORROSION TREATMENT IS ESSENTIAL
Protects Surfaces from Corrosion & Wear
Corrosion at the sheet edges of Cambridgeshire cladding accelerates over time, taking more coating with it. Specialist cut edge corrosion treatment stops that spread, sealing the edge against further rust.
Improves Safety & Compliance
A degraded building envelope in Cambridgeshire is both a safety and an insurance concern. Treating cut edge corrosion promptly restores the integrity of the cladding and roof and protects everyone around the building.
Extends Asset Lifespan
Every year you add to your cladding is money saved. Cut edge corrosion treatment in Cambridgeshire extends the life of the sheeting by up to 15 years, backed by an Insurance Backed Guarantee.
Enhances Professional Appearance
Nothing dates a Cambridgeshire building faster than rust-streaked cladding. Our treatment removes the streaks, re-establishes a sharp colour line and lifts the appearance of the whole property.
Cost-Effective Refurbishment
Cut edge corrosion treatment is the smart, cost-effective alternative to re-cladding in Cambridgeshire. It extends the life of the existing sheets by up to 15 years at a fraction of the cost, with no need to close the building.
REQUEST A CALLBACK
Lorem ipsum dolor sit amet, consectetur adipiscing elit ed rutrum pharetra risus.

Roof Spraying

Cut-Edge Corrosion Treatment

Cladding Spraying

Window & Curtain Wall Spraying

Industrial uPVC Spray Painting

OUR CUT EDGE CORROSION TREATMENT PROCESS
Step 1: Initial Consultation & Site Survey
Our Cambridgeshire team carries out a measured survey of the cladding, identifying every affected edge and lap before producing a full specification and quotation.
Step 2: Surface Preparation
Step two delivers a sound, clean, primed edge on your Cambridgeshire sheeting, with loose plastisol raked back, rust removed and a rust-inhibiting primer applied.
Step 3: Cut Edge Corrosion Treatment Application
Skilled Cambridgeshire operatives apply the manufacturer-specified system over every prepared edge, building up and sealing the cut edge to lock out moisture and stop corrosion.
Step 4: Quality Checks & Final Handover
We finish with colour-matched topcoats over the treated edges, inspect every elevation of your Cambridgeshire cladding and hand over the Insurance Backed Guarantee paperwork.
Our projects

Sky London Campus
Sky – Sky 2 / Sky 4
Colorkote has successfully completed a number of large scale spraying and painting projects for Sky within their London Campus. Due to the construction of the new Flagship Sky Central office complex including studios, a number of existing buildings were looking tired and due to the high profile visitors that Sky attracts they wanted these buildings re-coated and brought up to date.

London
Residential Blocks
This group of 10 blocks of flats are undergoing full window replacement. The surrounding wooden fascia, soffits and shiplap boarding required full decoration to match the new wooden windows. All the 105 flats are occupied, meaning all works had to be carefully programmed to cause minimal disruption to the residents. All works were completed using fixed scaffolding supplied by the main contractor.

London
Waste Recycling Plant
The site was a blight on the landscape being a very large building of bright colour. The client wished to tone down the building to blend in with the local landscape. A 10 yr warranty was requested on the completed work, and the building required very specialist high-level access, especially for the chimneys. Additionally the site needed to remain fully operational with hundreds of lorry deliveries daily.

FAQS
OUR COVERAGE AREA
Colorkote’s cut edge corrosion treatment covers the whole of Cambridgeshire and beyond. We work on industrial estates, business parks, warehouses, distribution centres and retail parks throughout the Cambridgeshire region, and our crews regularly mobilise out to surrounding towns, villages and neighbouring districts. From a single building to a portfolio of sites, we have the resource to match the project. Our nationwide capability also means we can take on work at any UK site you operate. To talk to a senior estimator about your Cambridgeshire project, call 01202798993.
WHAT OUR CUSTOMERS SAY
Stopped a major bill in its tracks
Andrew P., Industrial Estate Owner
Three years on, still perfect
Helen M., Facilities Director
Clear, professional and tidy
Chris N., Operations Manager
A smart alternative to re-cladding
Andrew L., Estates Manager
Brilliant from start to finish
Robert E., Operations Manager
